Energy Baseline
Last updated: Today, 08:45 AM · Reporting Period: July 2024
3
Energy Baseline Configuration
Established during energy audit · Reference period: Jan–Dec 2023
Electricity
145,000
kWh / month (baseline)
AED 87,000 / month
Water
820
m³ / month (baseline)
AED 2,460 / month
Diesel
4,200
Litres / month (baseline)
AED 12,600 / month
Cooling
0.95
kWh/TR (baseline)
Design: 0.85 kWh/TR
Complete Baseline Parameters
| Parameter | Baseline Value | Unit | Design Value | Best Practice | Source |
|---|---|---|---|---|---|
| Electricity Consumption | 145,000 | kWh/month | 132,000 | 115,000 | Utility Bills |
| Peak Demand | 430 | kW | 400 | 380 | Smart Meter |
| Power Factor | 0.96 | PF | 0.97 | 0.98 | Smart Meter |
| Load Factor | 0.72 | ratio | 0.75 | 0.80 | Calculated |
| Specific Energy | 145 | kWh/m²/yr | 132 | 110 | Calculated |
| Carbon Emission | 97.15 | tCO₂/month | 88.44 | 77.05 | Calculated |
| Energy Cost | 87,000 | AED/month | 79,200 | 69,000 | Invoice |
| Parameter | Baseline | Unit | Design | Best Practice | Source |
|---|---|---|---|---|---|
| Cooling Energy Intensity | 0.95 | kWh/TR | 0.88 | 0.72 | BMS |
| Chiller COP | 5.2 | 5.5 | 6.2 | BMS | |
| Pump Efficiency | 78 | % | 82 | 88 | Site Audit |
| AHU Runtime | 18.5 | hrs/day | 16 | 14 | BMS |
| Chilled Water ΔT | 7.2 | °C | 8 | 10 | BMS |
| Condenser Approach | 3.8 | °C | 3.0 | 2.5 | BMS |
| Cooling Load | 1,250 | TR | 1,200 | 1,100 | BMS |
| Parameter | Baseline | Unit | Design | Best Practice | Source |
|---|---|---|---|---|---|
| Total Water Consumption | 820 | m³/month | 750 | 650 | Water Meter |
| Water per Occupant | 82 | L/person/day | 75 | 60 | Calculated |
| Water per sq.m | 0.82 | m³/m² | 0.70 | 0.58 | Calculated |
| Cooling Tower Makeup | 185 | m³/month | 160 | 140 | Sub-meter |
| Irrigation | 95 | m³/month | 80 | 65 | Sub-meter |
| Domestic | 540 | m³/month | 510 | 445 | Sub-meter |
| Parameter | Baseline | Unit | Design | Best Practice | Source |
|---|---|---|---|---|---|
| Gross Floor Area | 1,000 | m² | — | — | Drawings |
| Occupancy | 350 | persons | — | — | FM |
| EUI (Electricity) | 145 | kWh/m²/yr | 132 | 110 | Calculated |
| Cost per sq.m | 87 | AED/m² | 76.8 | 66 | Calculated |
| CO₂ per sq.m | 97.15 | kgCO₂/m² | 88.44 | 73.7 | Calculated |
| Operating Hours | 16 | hrs/day | — | 14 | FM |